Mobile AI Data Centre on Wheels
// LAYER 03 · INFRASTRUCTURE · RESEARCH DIRECTION
Compute has become a power procurement problem, not a GPU procurement problem. Our published white paper designs the GENEYE-MDC-1: 96 NVIDIA B200s, direct-to-chip liquid cooling, 500 kWh of battery storage and 175 kW of deployable solar in a single 53-ft trailer — a data centre you drive to the electricity, instead of waiting years for a grid connection. Full architecture, CAPEX, OPEX and unit economics, published openly.
- 96× NVIDIA B200
- 17.3 TB HBM3e
- Deploys in days, not years
A direction, not a product. We do not operate data centres today — we are publishing the engineering so the thesis can be examined on its merits.